Essonne (91)
LIDL logistics platform
PROJECT OWNER
Panhard group
PROGRAM
Construction of a logistics platform for operator LIDL
surface
Dry and multi-temperature warehouse: 46,500 m² / Offices and social premises: 2,500 m² / Technical premises: 2,000 m².
AMOUNT OF WORK
35 M€ H.T.
LOCATION
Le Coudray-Montceaux - Essonne (91)
DESIGN ARCHITECT
Archifactory
MISSION
MOEX
PRODUCTION
Site 2019-2020 / Duration 12 months
Construction of a logistics platform for operator LIDL
A multi-temperature building incorporating a high level of mechanization to guarantee total control of the cold chain throughout the reception, storage and dispatching process, while respecting the budget constraints imposed by LIDL's competitive positioning among the major French retailers.
From -35° to +20°, a technical challenge for this warehouse built by A26 on behalf of Panhard Groupe and operated by LIDL. This multi-temperature logistics platform benefits from the latest mechanization technologies, enabling the retail group to dispatch both frozen and fresh products (fruit and vegetables, bananas, poultry, chocolate, yoghurts) in the Paris region.





