Louis Pradel Hospital
PROJECT OWNER
Hospices civils de Lyon
program
Creation of 14 25-bed accommodation units, 1 level meeting and conference rooms.
ASBESTOS TESTING
ARGENIUM
surface
19 000 m²
AMOUNT OF WORK
31.6 M€ H.T
production
Phase 1: Handed over in May 2017 Phase 2: Delivered in September 2018 Phase 3: Handover in July 2020 Phase 4: Handover in April 2022
LOCATION
Bron (69)
MISSION
MOE Complete + OPC
BET / ECONOMIST
EDEIS, Argenium, Global
representative
A26
photographer
Florian Mignot
The aim of the project was to remove asbestos from, make safe and completely renovate the hospital wards of a 14-storey building classified as a high-rise building, without disrupting hospital activities.
To achieve this, the worksite was divided into 4 successive phases, ensuring continuity of services and optimum safety. The project resulted in the creation of accommodation units, a meeting space, a pediatric intensive care unit, and two floors of cardiac intensive care, providing a pleasant and safe setting for patient recovery and staff working comfort.